Causes of Delays in Iranian Building Construction Projects | ||
| AUT Journal of Civil Engineering | ||
| مقاله 5، دوره 5، شماره 4، زمستان 2021، صفحه 613-624 اصل مقاله (875.62 K) | ||
| نوع مقاله: Research Article | ||
| شناسه دیجیتال (DOI): 10.22060/ajce.2022.19293.5725 | ||
| نویسندگان | ||
| Mahdi Rahmati1؛ Mahdi Rojhani* 2؛ Mohammad Amin Raoof3 | ||
| 1Graduate School of Management and Economics, Sharif University of Technology, Tehran, Iran. | ||
| 2Department of Civil Engineering, Faculty of Engineering, Shahed University; Tehran, Iran. | ||
| 3Department of Civil Engineering, Sharif University of Technology, Tehran, Iran. | ||
| چکیده | ||
| Building construction consumes a large percentage of the materials and energy of a country and plays a significant role in the sustainable development of a region. Therefore, any factor affecting construction can have a significant impact on that country. One issue faced by the construction industry as a whole is delayed completion of projects. Poor management practices, such as time management, are pervasive factors. This study investigated and evaluated the causes for delays in the completion of construction projects in order of significance. As applied research, this study examined the causes of delays in building projects in Iran. Library resources were used to extract a set of causes from the literature and these were used to form the items of a questionnaire. The significance of each item was evaluated based on severity and frequency indices. It was then distributed through social media among a society of engineers active in the field of building construction. A total of 216 responses were gathered and formed the basis of our analysis. The results indicated that late financing by the client, demands for kickbacks, non-standard procedures followed by officials, and unrealistic planning and time scheduling of projects were the main causes of delay. The results of this study are a wake-up call for development planners, policymakers, project managers, engineers, experts, clients, contractors, and consulting engineers. Sustainable development can only be achieved by controlling these determinants of construction delays. | ||
| کلیدواژهها | ||
| Delay؛ Scheduling؛ Sustainability؛ Project management؛ Building | ||
| مراجع | ||
|
| ||
|
آمار تعداد مشاهده مقاله: 854 تعداد دریافت فایل اصل مقاله: 1,325 |
||
| تعداد نشریات | 9 |
| تعداد شمارهها | 455 |
| تعداد مقالات | 5,771 |
| تعداد مشاهده مقاله | 8,376,252 |
| تعداد دریافت فایل اصل مقاله | 6,935,721 |